The SOLWOOD - Wide Brush Sander is a heavy-duty industrial sanding machine designed for efficient surface finishing, cleaning, and texture preparation of solid wood and panel materials. It is ideal for furniture factories, doors, panels, and solid wood processing units requiring uniform sanding and high productivity.

Technical Specifications

  • Maximum Processing Width: 700 mm

  • Minimum Processing Length: 350 mm

  • Maximum Processing Height: 10 – 200 mm

  • Work Table Height: 850 mm

  • Feeding Speed: 1 – 12 m/min (Variable)

  • Conveyor Motor Power: 1.5 kW

  • Power Requirement: 415 V / 50 Hz

  • Dust Collection Ports: Ø200 mm × 3 Nos.

  • Total Connected Power: 10 kW

  • Machine Dimensions (L×W×H): 3200 × 1600 × 2100 mm

  • Machine Weight: Approx. 2000 kg

 

Motor & Brush Head Configuration

(4 Head – Disc + Roller with Oscillation)

  • Total Brush Heads: 4 Heads

Disc Type Brush Heads (2 Nos.)

  • Type: Disc Sanding Heads

  • Quantity: 2 Heads

  • Function:

    • Edge sanding

    • Profile & contour sanding

    • Cleaning of uneven or carved surfaces

  • Disc Diameter: Heavy-duty industrial grade

  • Motor Drive: Independent high-torque motors

  • Application: Solid wood, doors, panels, decorative surfaces

Roller Type Brush Heads (2 Nos.)

  • Type: Roller Brush Sanding Heads

  • Quantity: 2 Heads

  • Function:

    • Surface sanding

    • Uniform finishing across full width

  • Roller Length: Suitable for 700 mm working width

  • Oscillation: Yes (Built-in Oscillating System)

    • Improves surface finish

    • Reduces sanding marks

    • Increases abrasive life

Brush Material Compatibility

  • Abrasive sanding brushes

  • Nylon / Sisal / Wire brushes (as per application)

Motor & Drive System

  • Brush Motors:

    • Independent motors for each brush head

    • Heavy-duty continuous-duty motors

  • Conveyor Motor:

    • Power: 1.5 kW

    • Gearbox-driven conveyor system

  • Speed Control:

    • Adjustable feed speed: 1 – 12 m/min

    • Optimized brush speed for burn-free finish

  • Height & Pressure Adjustment:

    • Precision height adjustment for all brush heads

    • Uniform pressure across entire working width